Bond beam lintel with rebar above doors at covered terrace. Eastern Wall with chimney.
Entries from May 2007
First Floor Exterior Walls
3
May 26, 2007 at 9:25am
by Christina
Vertical walls
2
May 23, 2007 at 8:12pm
by Christina
Tuesday May 22, 2007- A sales rep was onsite during the morning from Aercon to give some guidance as the masons began laying the block. First course
Building the Pyramid of Giza
1
May 23, 2007 at 7:57pm
by Christina
May 17, 2007- The block began arriving by the truck load at 8 am. Three truck loads or 53 pallets of block! Wow! I didn’t realize how white the block would be. They arrived from Aercon in Florida in very good condition. This tool arrived in not so great condition. This is the very crumpled [...]