Second floor Exterior walls going up

Comments   0   Date Arrow  June 10, 2007 at 6:56pm   User  by Christina

june-10-2007-016.jpg

june-10-2007-020.jpg
Notice the bolts protruding through the block to connect the floor joists to the walls. Concrete is in the U-blocks at this location and you can see the gray drips of the concrete. The drips are a good sign to us and let’s us know the blocks have been filled correctly.

june-10-2007-022.jpg

june-10-2007-030.jpg

june-10-2007-033.jpg

june-10-2007-034.jpg
Work on the arched openings- right now that have blocked up the arched area that will be cut out based on the plywood template seen at the ground level.

june-10-2007-041.jpg
These are the templates for the arches. This is the terrace right now, in the future it will have roof. The door above is to the master bedroom.

june-10-2007-035.jpg
Trusses for the floor joists and ceiling joists.

june-10-2007-036.jpg

june-10-2007-038.jpg

june-10-2007-042.jpg
LVL beam above Family Room to support wall above.

june-10-2007-043.jpg
LVL beam.

Tagged   General